Cooling Tower Replacement: What Is Included in the Scope
A tower replacement is more than a tower. Here is the full scope so two quotes can be compared honestly.
The tower is one line
A complete replacement scope covers everything from the first survey to the commissioning report. Missing items are where quotes diverge.
What a full scope contains
- Survey of the existing tower, base, piping and electrical.
- Engineering coordination and structural plans where the base changes.
- Permits and inspections.
- Crane, rigging and any street or lane closure.
- New structural base and isolation springs where required.
- Piping, valves and electrical connections, including the fan drive or VFD.
- Startup, water treatment coordination and commissioning readings.
- Disposal of the old tower.
Why bases and isolators matter
B&B’s 21-story replacement included a new structural base and isolation springs. Reusing tired steel and springs under a new tower is a false economy that shows up as vibration and corrosion.
Walking the scope with a facility team
B&B’s project manager walks the scope with the building team before the quote is final. Each line is explained: why the base is in it, why the isolators are new, what the crane day looks like, when the loop is down and how the water treatment handoff works.
Options that change the scope
- Matching the existing tower versus re-selecting for the current chiller load.
- Adding a VFD on the fan during the replacement.
- Replacing condenser water pumps that are near the end at the same time.
- Phasing a multi-cell tower to avoid a full outage.
Projects that show the pattern
The Alta and Pasadena Courtyard cooling tower retrofits and the Riviera Resort & Spa chiller and tower retrofit each followed this scope, surveyed first and commissioned last. The 21-story replacement added the structural base, isolation springs and a multi-day street closure.
Frequently Asked Questions
Can the existing piping be reused?
Often yes, after inspection. Valves that will not close are replaced so the loop can be isolated in future.
Is water treatment part of the replacement?
Startup coordination with the building’s water treatment provider is; the ongoing program stays with that provider.
How is a replacement commissioned?
Flow, approach, range and chiller head pressure are recorded under load and compared with design.
Is the water treatment provider involved?
Yes, at startup, so the new tower begins on the right chemistry; the ongoing program stays with that provider.
How is the old tower disposed of?
It is rigged off, cut down if needed and hauled for recycling as part of the scope.
Terms used in this guide
- Approach Temperature
- Approach temperature is the difference between the water leaving a cooling tower and the outdoor wet-bulb temperature, and it's the single best number for tracking a tower's health over time. A tower in good condition holds a fairly consistent approach; a steadily rising approach signals degrading heat transfer.
- Cooling Tower Range
- Range is the temperature drop across a cooling tower: hot condenser water in minus cooled water out. Range is set by the heat the chiller rejects and the water flow; a collapsing range usually points to a flow problem, not the tower itself.
- Wet-Bulb Temperature
- Wet-bulb temperature is the lowest temperature air can reach through evaporation at its current humidity. It sets the floor for how cold a cooling tower can make its water, which is why towers are rated against design wet-bulb, not dry-bulb, conditions.
- Makeup Water
- Makeup water replaces what a cooling tower loses to evaporation, drift and blowdown, and what a closed hydronic loop loses to leaks. A rising makeup meter on a closed loop is a leak indicator; on a tower it tracks load and water quality.
Next step
Cooling Tower ReplacementAbout this service
Cooling Tower Services →Talk to a real technician.
Tell us what's going on and our San Diego team will reach out. For emergencies, call us 24/7 at (619) 713-0400.
Call us 24/7(619) 713-0400- 24/7 Emergency Service
- Licensed & Insured
- 5.0★ Rated on Google
- Based in Lakeside, CA
10031 Maine Ave, Lakeside, CA 92040
Request your service
No obligation. We never sell your info.