Energy Costs and Commercial HVAC: What a Facility Manager Actually Controls
Most HVAC energy is decided by how equipment runs, not what it cost. Here is what is in a facility manager’s hands.
What you control
Run hours, setpoints, how clean the equipment is and how well the plant is sequenced. Those decide more of the energy bill than the equipment nameplate does.
The levers
- Schedules that match occupancy, including holidays.
- Setpoints and deadbands that are reasonable and locked.
- Clean coils, correct charge and working economizers.
- Variable speed drives programmed to the load.
- Chiller and tower sequencing that avoids running more equipment than needed.
What we do not promise
Specific percentage savings. Buildings differ, and claims without measurement are guesses. Readings before and after a change are how savings are known.
Finding the waste
Most waste hides in schedules and overrides. A plant conditioning an empty building on holidays, a setpoint pushed down by a complaint and never reset, an economizer stuck closed, or a drive in bypass running full speed. A controls review finds these without new equipment.
Measuring instead of promising
B&B does not quote energy savings as a percentage. Readings before and after a change, and the utility bill over the following season, are how a building knows what a change did. Where the client wants savings tracked, the baseline is recorded first.
Demand and the plant start
On commercial tariffs, how the plant starts matters as much as how long it runs. Staging chillers and pumps instead of starting everything at once, and letting drives ramp, keeps peak demand down. That is a sequence change, not a purchase.
Frequently Asked Questions
Does maintenance reduce energy use?
Clean, correctly charged equipment runs less to do the same work; the amount depends on how far it had drifted.
Are demand charges affected by HVAC?
Yes. Peak draw from a plant starting hard or running everything at once shows up as demand on commercial tariffs.
Should I replace equipment to save energy?
Only when the equipment is near the end anyway or the comparison supports it; controls and maintenance come first.
Will a maintenance agreement lower the bill?
Clean, correctly charged, properly controlled equipment runs less to do the same work; how much depends on how far it had drifted.
Is replacement the best energy move?
Only when the equipment is near the end anyway. Controls and maintenance come first on a sound plant.
Terms used in this guide
- Preventative Maintenance Agreement
- A preventative maintenance agreement is a scheduled program of inspections, cleaning, testing and adjustments on a building's mechanical equipment, written to the specific towers, chillers, boilers, pumps and rooftop units installed.
- Economizer
- An economizer is a set of dampers and controls built into a rooftop unit that pulls in outside air to cool a building directly whenever outdoor conditions are cool and dry enough, reducing how often the mechanical compressor has to run. It's standard equipment on most commercial RTUs sold today.
- Rooftop Unit (RTU)
- A rooftop unit (RTU) is a self-contained, all-in-one HVAC package — compressor, condenser, evaporator coil, and often heating — housed in a single outdoor cabinet mounted on the roof and connected directly to a building's ductwork. It's the standard cooling and heating equipment for single-story commercial buildings, retail centers, and warehouses.
Next step
Commercial HVAC Preventative MaintenanceAbout this service
Preventative Maintenance →Talk to a real technician.
Tell us what's going on and our San Diego team will reach out. For emergencies, call us 24/7 at (619) 713-0400.
Call us 24/7(619) 713-0400- 24/7 Emergency Service
- Licensed & Insured
- 5.0★ Rated on Google
- Based in Lakeside, CA
10031 Maine Ave, Lakeside, CA 92040
Request your service
No obligation. We never sell your info.
